Remove remaining floor tile from RBOF (Receiving Basin for Off-site Fuel) facility. Scope of work includes removing floor tiles, removing tile mast…
Installation of 6 New Trailers with Utilities and including sidewalks at 742-G Trailer Complex Area. …
This design change (M-DCF-K-00585) will replace the 216-B sump pump and the associated discharge piping. Due to the existing anchor bolts in the su…
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
Aqueous corrosion testing is performed for numerous materials in solutions composed of an array of chemicals. …
Pull sediment samples from settler tank for characterization and ultimate disposition.…
719-N Prep and Paint 8 Concrete Bollards for High Visibility …
The Cyberex Inc Rectifier-Charger Model 130/106R3 is being replaced with the Hindle Power Station Float Battery Charger in Building 108-2K.…
Chiller #1 is an air-cooled unit which requires periodic coil cleaning. The Site Stormwater SME has received approval from SCDHEC for release of c…
Subcontractor will provide roof repairs at Building 717-12F. The Subcontractor will not disturb the existing roof while performing these repairs on…