Replace 20,000 sq. ft. of carpet in the common areas and replacement of carpet for 17 offices in Building 707-C.…
Deployment of new trailers, septic system, and extended personnel and delivery truck parking to support Z-Area 24X7 operations.…
The proposed action is to remove and replace existing roofing systems on Building 221-F Truckwell.…
This activity will encompass two (2) analytical methods that will be performed in 773-A, B-111: Interfacial Tension (IFT) and Oil and Grease Analys…
Setup and testing of sorbent material for incorporation into the offgas mitigation train of the Mobile Melter Consolidation (MMC) effort.…
The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam (L-La…
The scope of this task will replace the diesel engine and generator and consolidate and or replace the existing 4 Motor Control Centers (MCCs) in R…
Batch contact testing will be performed to examine the removal of cesium from Tank 9H salt solution using crystalline silicotitanate (CST).…
This EEC is part of the F and H Laboratory (FHL), 773-A Laboratory Modification Project. This activity covers the preparation of radioactive standa…
At the Aviation Operations Department, a fuel drip has developed. An absorbent pig is located within the fuel pit and is absorbing the drip. The dr…