This activity will study and develop the process conditions and equipment to calcine up to 1 liter batches of DGA resin in support of the Mk-18A pr…
This proposed activity will remove roofing on top of H Canyon and install a water-proofing system.…
This proposed activity will renovate men's and women's bathrooms on the fourth level of H Canyon.…
Dispose of HEPA/Pre-filters to N-Area form IH Hood used to analyze potential asbestos samples.…
Sampling crew will Collect 1” x 18” sediment cores and surface water samples from the Steeds Pond Soil Contamination Area.…
CX-021052: Remove Two PACM Gaskets from F Base Injection Flow Indicator Transmitter (flange) FIT-170
Remove two Presumed Asbestos Containing Material (PACM) gaskets from Flow Indicator Transmitter (CIS-FIT-170) at F Base Injection.…
Four monitoring wells near the perimeter of the Mixed Waste Management Facility need the current deployed submersible pumps replaced with low flow …
Treatability Study in D-area to support D-Area Groundwater Remediation…
The recloser on A01 feeder is reaching end of it's life cycle and should be replaced.…
Repair PACM inuslations in Building 772-F, Room 108.…