The purpose of F-DCF-H-00743 is to create an “Electrical Airgap” between Buildings 234-H and 236-H. Fire alarm and detection equipment within Build…
Replace Valve SCW-V-4501 at K-Area Assembly Area and associated insulation.…
Painting the exterior of Building 701-1L.…
Isolate electrical power, generator power and utilities (steam, water, air) to Building 235-F, 235-1F, 235-2F, 607-3F and Cooling Tower 285-11F. Ve…
The Emergency Operations Center (EOC) has operated beyond its expected lifetime and has become inadequate to provide necessary response for possibl…
A subcontractor will design and construct a permeable reactive barrier (PRB) in the subsurface to intersect volatile organic compound (VOC) contami…
Removal of presumed asbestos containing material (PACM) gaskets to replace plastic relief valve (PSV 002) for Phosphate pump 002 located inside 789…
Remove from SRS Trailer 703-18B, Executive Mobile Portalet 724-42E (located in B Area), and 3 transformers. Relocate Trailer 703-18B to Z-Area. De…
Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…
A supplemental purge ventilation system is required to support the Pulse Tube Agitator (PTA) operation in FPP-1 during future transfers. Higher ve…