Remove and reinstall insulation from Service Water (SW) Pump 003 so that check valve can be replaced.…
Painting interior of 701-1L…
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
Main Feeder Utility Pole Treatment requiring soil disturbances within the B, D, L, K, and General Technical Areas. …
Replace failed flow transmitter for RWM-02 Recovering Well located in A/M Areas. …
The obsolete discrete HVAC controllers in HB Line will be replaced with DCS control.…
As part of the larger site Lab Consolidation effort, F/H Analytical Laboratory (F/HAL) is preparing to transition multiple labs to Inactive or La…
This proposed activity will remove wallpaper, paint walls, and remove carpet from Building 703-H.…
The proposed activity will perform asbestos abatement work in the H Canyon Hot Gang Valve Corridor (HGVC).…
Replacement of tile, carpet and sheet rock due to water damage / mold growth from water leak in heater room in 704-C…