Renovate exterior of wall of Room 332 in Building 730-4B to include wallpaper removal, painting, and vinyl lettering.…
Mobile melt consolidation is working with NNM and DOE headquarters to develop processes for disposition of nuclear materials by melting intostainle…
Construct a new asphaltic pavement between Buildings 731-1N and 731-2N.…
Handi-House, SRS-PB-00514, is to be demolished due the structure collapsing.…
Subcontractor will provide roof repairs at Building 703-10B.…
Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electricalre…
Remove portions of existing guardrails, conduit, and conduit support, and remove ladder on 249-H.…
Remove existing guardrails and ladder on 234-H. Install an aluminum ladder that meets OSHA and NFPA 101 requirements.…
Activities to support Tank Farm and DWPF with qualification of Sludge Batch 10.…
Generate trace level dimethylmercury gas standards using a permeation tube and a Kintec calibration gas generator system.…