Replacement of Area Velocity Flow Sensor at Stream Surveillance Location FM-A7…
Replace carpet in IT Area in 730-4B 1st Floor.…
A new domestic water well will be installed for the Barnwell Barricade.…
The activity consists of flowing Ar or N2 through a packed bed of porous zero valent iron (p-ZVI) to measure the pressure drop across the bed.…
SRNL will determine the moisture retention properties of various formulations of cementitious materials that are representative of SRS and offistew…
Air gapping of mechanical lines to isolate building 236-H.…
Install a 250V, 20A, NEMA 6-20R receptacle with cover plates in room 126 of 773-52A.…
This project includes taking soil samples at the H, K, and L-Area Ash Basins, and conducting visual inspections for ash along transects todelineate…
Install additional 120V receptacles in Rooms 106, 107, and 185 of Building 703-47A.…
Install VTC in room 344 of 730-1B.…