This proposed activity will remove roofing on top of H Canyon and install a water-proofing system.…
Treatability Study in D-area to support D-Area Groundwater Remediation…
CX-021052: Remove Two PACM Gaskets from F Base Injection Flow Indicator Transmitter (flange) FIT-170
Remove two Presumed Asbestos Containing Material (PACM) gaskets from Flow Indicator Transmitter (CIS-FIT-170) at F Base Injection.…
Repair PACM inuslations in Building 772-F, Room 108.…
Construction of Prefabricated metal building, potable water line, and septic/drain field, and installation of two evaporators.…
Subcontractor will provide roof repairs at Building 706-3F. The Subcontractor will not disturb the existing roof while performing these repairs on…
Subcontractor will provide roof repairs at Building 226-2F. The Subcontractor will not disturb the existing roof while performing these repairs on…
The recloser on A01 feeder is reaching end of it's life cycle and should be replaced.…
Subcontractor will provide roof repairs at Building 225-5H. The Subcontractor will not disturb the existing roof while performing these repairs on …
Sodium and lithium are present in most environmental samples. In seawater and some fresh water samples, the sodium concentration can cause interfer…