Repair cracking, spalling, detaching of concrete along expansion joints and construction joints of the 221-H concrete exterior walls.…
Four characterization soil bores northwest of the M Area Settling Basin to further characterize the high concentration VOC plume.…
Apply water-proof coating and sealant to newly installed plywood on top of cell No. 4 on 785-2A, Cooling Tower 2.…
Replace existing propane monitors at Building 754-11A.…
Oxidant injection to enhance remediation of chlorinated ethenes-tetrachloroethene, trichloroethene, and daughter products...…
This EEC addresses the installation of 12 groundwater monitoring wells and eight injection points ...…
Replace floor tile in building 713-1N, Section A1, Corridor No. 2 hallway between offices N321 and N204.…
Install a hands free water dispenser in the lobby of 730-2B.…
717-8N and 717-9N Public Address System Installation…
Replace Metal Halide lighting with LEDs inside Building 236-3F, WSB.…