Setup and testing of sorbent material for incorporation into the offgas mitigation train of the Mobile Melter Consolidation (MMC) effort.…
Batch contact testing will be performed to examine the removal of cesium from Tank 9H salt solution using crystalline silicotitanate (CST).…
The proposed action is to remove and replace existing roofing systems on Building 221-F Truckwell.…
The scope of this task will replace the diesel engine and generator and consolidate and or replace the existing 4 Motor Control Centers (MCCs) in R…
EEC covers the Real Estate Lease, siting, construction, utility installation and operation of the Verizon-SRS ll Cell Tower and appurtenances adjac…
Repair SW Valve No. 10 at 681-3G.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
At the Aviation Operations Department, a fuel drip has developed. An absorbent pig is located within the fuel pit and is absorbing the drip. The dr…
Two plastic 3D printers will be operated inside 723-15A.…
This EEC covers the installation and operation of an autoclave, Model SSR-3A-ADVPB in Building 607-17A.…