Remove receptacles and non-load-bearing wall, repaint walls, and replace carpet and baseboards in Building 773-63A, Rooms 10 and 11.…
Install Portable Heaters and Diesel Generators to Provide Temporary Heat For Y708 Project Tie-Ins…
CO Monitor Calibration/PM of the Compressed Air Purification System in 108-1L…
Subcontractor will provide roof replacement at Building 701-2L.…
SRSCRO will dismantle and remove D Area Metal Buildings including 484-15D D-Area Storage Building, 683-D Chlorine Building, ...…
Pump Corrshield MD4100 into Chilled Water Loop at 789-2B.…
Subcontractor will provide roof repairs at 773-63A. The Subcontractor “will not” disturb the existing roof while performing these repairs on 773-63…
The proposal is to convert Forms Monitor to Stack Monitor in HAOM (or 234-H) when spare part is no longer available to perform corrective maintenan…
A new metal-organic framework (MOF) will be tested for removing pertechnetate from a sample of SRS high level waste…
Install Universal Wiring (UW) drop in Building 730-2B, Cubicle 2082 and Room 113 (Collaboration Room).…