This EEC is written to cover characterization work associated with salt batch qualification samples.…
Aqueous corrosion testing is performed for numerous materials in solutions composed of an array of chemicals.…
These two methods determine the concentration of oxygen/nitrogen/hydrogen and carbon/sulfur in various materials.…
Construction personnel will renovate the interior of Building 701-1H.…
Project Management & Construction Services (PMCS) operates an insulation fabrication shop at 717-10N.…
There is a need to set up three washing machines outside of 719-H in the Ambulance Bay.…
Install a new laboratory hood in Building 773-A, Lab B-147 and 151 along with two Spectrometers and supporting services.…
Site construction will clean the floor at Building 731-6N of bird droppings using a clorox bleach solution.…
Re-caulk windows at the southeast and northeast corners of 730-B.…
Remove designated areas of crusher run and replace with asphalt.…