Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electricalre…
Subcontractor will provide roof repairs at Building 703-10B.…
Remove existing guardrails and ladder on 234-H. Install an aluminum ladder that meets OSHA and NFPA 101 requirements.…
Activities to support Tank Farm and DWPF with qualification of Sludge Batch 10.…
Generate trace level dimethylmercury gas standards using a permeation tube and a Kintec calibration gas generator system.…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is not required.…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. …
This EEC covers all Site Services preventative and corrective maintenance activities that have the potential to disturb gasket materials.…
This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containingmateri…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is required.…