As part of the modified Phase 4 plan for the 288-F Ash Basin Landfill Reclamation Project, this activity will involve relocation of approximately3,…
Install two wall mounted HVAC units, or engineering approved equal, and any supporting electrical outlets or power sources.…
This EEC is written to cover solvent qualifications associated with the Salt Waste Processing Facility, SWPF.…
Removal of asbestos containing material, ACM, and presumed asbestos containing material, PACM, from multiple ancillary buildings in thevicinity of …
Inspection and treatment of wood utility and power poles along Burma Road, including ACP, Waste Water Treatment, and other G-Area facilities.…
The proposed activity is to replace the roofing systems over 773-A, E-004, 008, 131 and conduct warranty repairs as needed.…
Plants will be germinated and treated with chemicals such as organophosphates and flowering promoters.…
A series of non-rad tests will be performed to study the oxidative destruction of glycolate and/or tetraphenylborate containing solutions.…
Nitrate salt simulants containing varying water concentrations will be combined with organic, wheat, kitty litter for thermal aging studies in anAc…
This scope is intended to cover the drying and compression of Calcium Chloride, CaCl2, salts.…