Determine Solubility and Vapor Pressure of Monomethyl Mercury in Tank Waste Simulants Using Milestone Direct Mercury Analyzer (DMA-80).…
The planned work scope is for the removal of floor tile and mastic known to contain asbestos in Room 54 of Building 713-N. Dispose of asbestos con…
Subcontractor will provide assembly and disassembly roof repairs at Building 105-L. The subcontractor "will not" disturb the existing roof while p…
NDE Inspection of the DBCF underground piping. The piping is approximately 7 ft below grade.…
Subcontractor will provide renovations to 773-A, outside entrance canopy and surrounding area.…
Materials Science group is in need of services for operating a Helium Leak Detector inside A-773000-OGE-GB-34. The leak detector will be used in s…
Project Management & Construction Services (PMCS) will be installing a new electric plant air compressor near Building 725-2N.…
The goal is to develop and demonstrate high density stainless steel pellets or pucks containing surrogate materials for plutonium oxide embedded wi…
Install new conduit and transmitter/receivers in the K-Area Reactor building for system enhancements.…
Replace packing and unclog drain on cooling water supply pump 004 at 285-H.…