Replace Carpet in Room 1059 of Building 766-H.…
Perform cleaning, seal coating, and restriping of parking lot in F-Area. Clean and stripe main parking lot in F-Area.…
The activity includes designing, installing, and operating a new remediation well, similar to the existing remediation well RWM-18, that pumps grou…
A Non-Time Critical (NTC) Removal Action will be conducted for the C-Area Groundwater (CAGW) Operable Unit (OU) TCE plume. The NTC Removal Action w…
Replace Discharge Pump #1 at the 607-1M lift station due to failure.…
Removal of two 1/2"-asbestos gaskets from an Inlet Sample Valve on the Purge Water Tank # 1 in M-Area (M-782002) and replace with asbestos gaskets.…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O&M Plan is not required. These exca…
Adding additional grab ports to the MS3 grab sample manifold.…
This scope of work is to remove any existing material from the three specified expansion joints—one of which lacks any sealant and is cracking—and …
Temporary modification, 233H-TMC-18-256, is initiated to replace the currently installed water trap # 2 level probe (H-233000-STRP-LE-ZR.290L), loc…