Install metal/cork strips around Room 76 in Building 707-F.…
McQuay Chiller #1 is an air-cooled unit which requires periodic coil cleaning. The Site Stormwater SME has received approval from SCDHEC for relea…
Installation of D-Area groundwater monitoring wells for data collection. …
Evaluate and repair crane solenoid and breaker that is intermittently tripping on low lift crane at 681-3G.…
Install sidewalk and replace damaged stairs at Building 226-2F.…
Remove presumed asbestos containing material (PACM) gaskets from flanges and conduct maintenance on relief valve PSV-012 (Pressure Safety Valve).…
Remove 252-9H Substation northwest of Building 232-H in the Tritium facility. …
Remove Research Reactor Fuel Counter II (RRFC II) and associated equipment from 105-L Disassembly Basin.…
Project Y-757 replaces E3S with the Argus Security System for components not already identified by Projects Y-738, Y-732 and Y-724 in the Tritium F…
Disconnect and remove electrical cables and fuses from 125V Distribution System in 108-2L.…