Subcontractor will provide roof replacement at Building 251-F. The Subcontractor “will ” disturb the existing roof while performing this replacemen…
The goal of the catalyst research is to create innovative materials and intellectual property. This project seeks to develop a high performance cat…
Passive counting of potentially radioactive samples using commercial radiation counting systems (i.e. alpha, beta, and gamma detectors/counting sys…
Due to a concern over the occurrence of potential biological material in the SRS Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) Strip Fe…
Subcontractor will provide roof repairs at Building 763-52N. The Subcontractor will disturb the existing roof while performing these repairs on Bui…
Subcontractor will provide roof replacement at Building 717-K. The Subcontractor will disturb the existing roof while performing this replacement o…
Proposed activity covers those actions associated with cleaning and maintenance of lasers owned by SRNL/AD at HRTL. …
Ten soil vapor extraction wells (SVE) wells will be disconnected from the Western Sector Treatment System (WSTS) active SVE system and reconfigured…
Excavate 16,820 m3 (22,000 yd3) of ash and contaminated soil media from the boundary of the P-Area Ash Basin to the edge of the 30-m (100-ft) buffe…
On Saturday, May 4, 2019, the fire water line west of 221-H South Dock failed. A sink hole was created by the water flow which caused a bollard to…