NDE Inspection of the DBCF underground piping. The piping is approximately 7 ft below grade.…
Subcontractor will provide assembly and disassembly roof repairs at Building 105-L. The subcontractor "will not" disturb the existing roof while p…
The planned work scope is for the removal of floor tile and mastic known to contain asbestos in Room 54 of Building 713-N. Dispose of asbestos con…
Project Management & Construction Services (PMCS) will be installing a new electric plant air compressor near Building 725-2N.…
Subcontractor will provide renovations to 773-A, outside entrance canopy and surrounding area.…
Materials Science group is in need of services for operating a Helium Leak Detector inside A-773000-OGE-GB-34. The leak detector will be used in s…
The goal is to develop and demonstrate high density stainless steel pellets or pucks containing surrogate materials for plutonium oxide embedded wi…
Install new conduit and transmitter/receivers in the K-Area Reactor building for system enhancements.…
Replace packing and unclog drain on cooling water supply pump 004 at 285-H.…
This activity will modify the chemical feed system and associated concrete containment structures at the 789-B domestic water treatment plant.…