A supplemental purge ventilation system is required to support the Pulse Tube Agitator (PTA) operation in FPP-1 during future transfers. Higher ve…
Steam line insulation removal to identify and fixed leak upstream of Valve PSS-V-7703.…
Testing the use of electrolytic dissolver to dissolve a variety of materials (e.g. stainless steel).…
Install additional receptacles and paint in Room 135 of Building 730-2B.…
Uranium will be separated from radioactive sample matrices by use of UTEVA resin. Liquid residue will be created from the additional radioactive ma…
Remove and replace the defective seal on the #5 Cone Valve at the 681-3G Pump House. Seal is suspect asbestos.…
The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in R…
Prep and paint pump skid at Waste Solidification Building (WSB).…
Five office trailers, one bathroom trailer and one handi-house in L-Area will be removed and replaced.…
Isolate the KAC Cf-252 Shuffler, Shuffler Instrumentation Cabinets, and Shuffler Room lighting and receptacles from all Electrical Power Sources an…