The Process Computer System (PCS) for the Function Test Station (FTS) is beyond its service life and needs to be replaced. Some of the components a…
A subcontractor designed and constructed a permeable reactive barrier (PRB) in the subsurface to intersect volatile organic compound (VOC) contamin…
There are currently employees stationed at the 263-170H warehouse, which does not have any form of air conditioning. Swamp coolers are currently us…
Replace the 50 ton chiller (T948-500-10) located inside of Building 249-H…
Repair walls, floor and seal roof of Trailers 735-10 and 735-9. Activities will require removal and replacement of damaged wood paneling, wall ins…
This design change (M-DCF-K-00585) will replace the 216-B sump pump and the associated discharge piping. Due to the existing anchor bolts in the su…
Five office trailers and one bathroom trailer in L-area will be removed and replaced.…
Removal of presumed asbestos containing material (PACM) gasket material at 784-7A Steam Plant in various flanged connections to allow for maintenan…
Americium will be electrodeposited onto a solid substrate from an acidic media. Rev. 1 changes lab that work will be performed in.…
This activity details the general operation of the FormLabs Form2 SLA resin 3D printer along with the post-processing tasks associated with 3D prin…