Perform various repairs to trailers 704-33L, 704-34L, 704-35L, 704-36L, and 704-37L. Portalets to be used while restrooms are out of service.…
Cleanup possible asbestos material outside of 618-G. Repair PACM piping inside of 618-G room 201.…
SRNL R and D Advanced Engineering group will test two new nitrogen chillers for the Tritium facility.…
The Spent Material Sampling System (SMSS) is out of service and no longer operational. Since the SMSS is no longer operational, the pressure relief…
This EEC covers the recycling of DOE assets for profit, including but not limited to electronics, scrap metal, brass casings, lead and lead acid ba…
This work consists of removing an out-of-service safety shower/eyewash station and its indicator light from Room 35 in 233-H. This D and R is to pr…
The 511-S Low Point Pump Pit Recycle Waste Transfer Pump has failed and must be replaced.…
This Scope of Work (SOW) provides direction for the installation of an AMI 221R Oxygen (O2) Monitor outside of lab C-118 in building 773-A. Work in…
Replace west side entrance door on 704-35E…
C. E. Bourne Subcontractor 00000611 will perform roof repairs on 703-41A. The Subcontractor will not disturb the existing roof on 703-41A.…