Confined Space Mock-up Trainer Modifications in Room 1056 of Building 766-H.…
Clean Out the Desiccant in Air Dryers at 285-H.…
Sliding Door Repair at 763-52N…
Install of Labconco ventless hood and Labconco storage cabinets.…
The HMI ("Signal" software running on Windows 7 PC) for the HVAC system at the 2H control room building is obsolete and unreliable. This HMI platfo…
Revision 4: Additional scope of approximately 930 LF of 6" diameter Fire Water line and 4 new Fire Hydrants, tied into existing Fire Water system. …
SREL is creating a new laboratory space in building 737-18A to be used for radiological research.…
EEC covers the Real Estate Lease, siting, construction, utility installation and operation of the Verizon-SRS ll Cell Tower and appurtenances adjac…
A new Isolator Inert Glovebox (GB) and supporting gas services are to be installed in Building 723-15A, Metal Printing Laboratory. It will be used …
Activity involves collecting water samples from groundwater wells and surface water stations at the F-Area Seepage Basins and its associated wetlan…