The EEC covers the renovations to the interior and exterior of building 717-F.…
Remove/Replace Flooring, Install Insulation, Sheetrock, and Paint in 711-1K Fitness Room…
The fire department will be using non-PFAS foam for training activities at 706-C.…
Remodel/Repair Restrooms in 731-2N, 731-3N and 731-4N.…
Road B (9.7 miles) will be milled, paved, striped with thermoplastic, and edge dressed with topsoil and grassing.…
Centerra-SRS Training Department would like to develop an area in C-Area for training department use.…
Replace glovebox gaskets in GB OGE-GB-1593.…
This EEC covers the demolition of 54-39G wait station shed.…
Refurbish the old excess yard (763-52N).…
The 50-ohm resistance thermal device (RTD) for 6.2F will be replaced with a 100-ohm platinum (Pt) RTD. The associated recorder shall be reprogramme…