This activity will investigate the dissolution rate kinetics of metal oxides, with a particular focus on lanthanide oxides, in an organic solutions…
Evaluate and Correct Process Well 905-119H. Repair/Replace Process Well Water Piping, Air Trap, and Valves.…
Subcontractor Thomson Roofing will perform a roof replacement on 707-F. The Subcontractor "will" disturb the existing roof on 707-F.…
Replace sidewalk section near 722-A.…
Pump Out Waterjet Tank in 773-50A.…
Relocate and demolish trailers 719-1N and 719-4N (Revision 2).…
Re-develop 22 piezometers and 2 inclinometers in the vicinity of the Steel Creek Dam, and 48 piezometers in the vicinity of Par Pond Dam. Eleven (1…
The TEF Platform Mounted Robotic Arms (PMRA) are from 2003 and upgrade modifications are necessary for continued operation. The Proposed Activity i…
Upgrade Universal Wiring to CAT 5e in 731-1N.…
Replace submersible pump with two Gould 3171 ST vertical Sump Pumps Size: 1.5x3-6/5V.…