Apply fire retardant coating FireFree88 (SDS No. 43617-1) to butcher block desks/benches/rolling toolboxes as specified by approved applicable work…
The existing H-Canyon Railroad Tunnel (RRT) rollup door has exceeded its expected lifespan and needs to be replaced.…
The laser system for the Function Test Station (FTS) is beyond it's service life and needs to be replaced.…
Advanced Engineering Fabrication, Assembly, Testing, Installation, and Maintenance of a table frame and robotic arm handling of objects.…
Remove existing air station off of private property and install a new air station at the old Williston barricade.…
An electrical resistance tomography (ERT) system (a geophysical method) will be tested on the low permeability geosynthetic cap over the closed Tre…
Installation of two new double-wide trailers in N-Area.…
Replace 731-N HVAC with a new system.…
Prepare and paint 10-foot metal building walls with a 10-foot parapet wall above the roofline.…
This EEC addresses the MT to design and install new rotameters to replace the obsolete rotameters in the 233-H Tritium Air Monitoring system.…