DCF and associated work order to repair the bottom of P68 manhole and raise it to grade for easier access in the future.…
Cleaning and surface modification procedures of wrought and additive manufactured stainless-steel components will be performed.…
This EEC covers the renovations to the west entrance airlock to 713-1N.…
Subcontractor will perform a roof replacement on 211-8H. The Subcontractor will disturb the existing roof on 211-8H.…
Upgrading the SRS technological infrastructure by installing underground fiber optic cable at various locations across the site. Revision 3 include…
730-B Patch/Paint various offices.…
703-46A Replace fire alarm system.…
703-45A Bathroom renovations.…
Renovate the 751-1A Men's restroom, offices, kitchen, and hallway. Replace flooring in the kitchen.…
50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs. Associated Recorder shall be reprogramed to accept the new 100…