Transformer 3 in Transformer Room 3 105-K is being replaced.…
K-Area Purification (105-K) Bathroom Vanity Replacement, Walls Prep and Paint.…
717-F Replacement of the Annex 20 Ton HVAC Unit.…
730-B Install Windowsill sealant in conference room 117.…
Subcontractor will perform a roof repairs on 703-5B. The Subcontractor "will not" disturb the existing roof on 703-5B.…
Installation of VTC in 730-1B Rm. 329.…
50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs. Associated Recorder shall be reprogramed to accept the new 10…
Refurbish Office Trailers 742-G through 742-5G.…
The Soil Vapor Extraction Unit (SVEU) at A-Area Burning Rubble Pit has been abandoned in place. The SVEU has been disconnected electrically and mec…
Fuel-cell style membranes will be used to evaluate hydrogen isotope separations. Hydrogen/deuterium (pure or mixtures) will flow on one side of the…