This EEC addresses three general activities associated with the remediation of the Lower Three Runs (LTR) Integrator Operable Unit (IOU): 1) Sedime…
D and R the abandoned heat recovery coil in the fan supply unit located in building 735-11A, Room 201. Replace the steam and chill water coils in t…
Replace defective Vessel Vent System duct heater and control panel in building 776-4A. VVS duct heater to be removed will contain internal radioact…
Subcontractor Thomson Roofing will perform a roof replacement on 714-N.…
Maintenance will remove/replace Tank 181 East and West strainer to inspect for blockages and clean.…
Sputter deposition is a physical vapor deposition method of depositing thin films on substrates. This EEC cover the activities for the preparation …
Cooling Oasis with Installed Fire Protection in 163-70K.…
Savannah River Nuclear Solutions (SRNS) Fleet and Fuel Operations to replace the existing FCT (fuel control terminal) system.…
To install permanent covers for the 735-22A Cylinder Storage Area for the hydrogen and propane gas delivery systems.…
Road E (2.5 miles) will be milled 2-1/2 in, paved with 1 in Open Graded Interlayer (OGI) and 2 in of asphalt, striped with thermoplastic and edge o…