This activity includes sorption and desorption of solids and aqueous solutions to determine distribution coefficients for various elements.…
Office space improvements in 737-A.…
The adsorption of different gases (hydrogen, oxygen, neon, argon, krypton, xenon) on metal particles (silver, gold, copper, palladium, platinum) an…
The EEC covers the renovations to the interior of building 711-2N.…
Extend the H Tank Farm Tank 29 purge exhaust stack to 70 feet above the tank top.…
This EEC covers various general renovations for Building 773-45A.…
The work consists of scraping the peeling paint on the ceiling of various offices and repainting them, removal of the existing carpeting throughout…
The subcontractor, Queen City Railroad Construction, shall replace wooden line ties from the railroad bed, identified by site transportation and en…
This activity will study and develop the process conditions and equipment to calcine up to 1 liter batches of DGA resin in support of the Mk-18A pr…
The Chemical Process Cell (CPC) Purge Air Receiver is too small for the flowrate needed by the CPC vessels.…