Modify Plant Airline and install equipment in 717-F machine shop…
BSRA proposes to construct and operate a Non-Radiological Laboratory Center in A Area at the Savannah River Site (SRS).…
This EEC covers various general renovations for Building 735-A, such as flooring/cove base replacement, ceiling tile replacement, drilling, paintin…
This is a collaborative study with USFS and University of Wisconsin. This research will allow USFS to better understand the relative ecological eff…
P41 Caustic Pump and Piping Electrical Heat Tracing and Freeze Protection…
In support of Effluent Treatment Facility (ETF) and Saltstone facilities being combined into a single organization called End Stream Delivery (ESD)…
This EEC will cover work associated with the replacement of the cipher lock on fire door 312 in 221-H room 308 and the crash bar if necessary.…
The EEC covers the renovations to the interior of building 711-9N.…
The objective of this work is to prepare samples for iodine speciation in environmental samples by testing for iodide, iodate, and organo-iodine co…
The Building for 789-B serves as the back-up water treatment facility for the Site's domestic water system.…