Mobile melt consolidation is working with NNM and DOE headquarters to develop processes for disposition of nuclear materials by melting into stainl…
784-7A Boiler No. 2 Retubing.…
Caulking to be removed and replaced with non-asbestos caulking.…
Advanced Tactical Training Academy (ATTA) or Bobby Davis Range (BDR) changed from 40 caliber (.40 cal) to 9 -millimeter (9 mm).…
Windows in 704-L need caulking. Asbestos is present in the existing window glazing material, therefore the caulk will be added with plans not to di…
The current Instrument Air (IA) High Density Polyethylene (HDPE) Poly-flo tubing is sagging alongside the northeast end of building 234-H and has p…
Insulation will be removed/installed and maintenance activities will be performed on the steam lines during the 2023 steam outage in SRTE.…
Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…
713-4N Replace door at Pipe Yard office.…
704-3N Correct walkway.…