Subcontractor will perform a roof replacement on 211-8H. The Subcontractor will disturb the existing roof on 211-8H.…
Upgrading the SRS technological infrastructure by installing underground fiber optic cable at various locations across the site. Revision 3 include…
730-B Patch/Paint various offices.…
703-46A Replace fire alarm system.…
703-45A Bathroom renovations.…
Renovate the 751-1A Men's restroom, offices, kitchen, and hallway. Replace flooring in the kitchen.…
50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs. Associated Recorder shall be reprogramed to accept the new 100…
There are 31 cylinders in 731-6N that bear expired DOT permit marks (denoted by DOT-SP or DOT-E) that have been disallowed for shipment back to Nex…
AM and DO Warehouse Personnel will use a floor scrubber to clean the floors of the warehouses at 731-1N, 731-2N, 731-3N, 731-4N, 731-5N, 713-1N, 71…
Refurbish the 105-L 15 Womens and Mens Restrooms and Refurbish 105-L level 0 Women's and Men's Restrooms and Women's Restrooms.…