M-DCF-H-13025 is to install a TIDS sample point on to NEVAC Tank B. The sample point would allow for sample bombs to be connected to NE-TB to colle…
The 911 fan room ductwork has been abandoned and has fallen into disrepair, becoming a safety hazard and a maintenance issue. It will be removed to…
The facility is preparing for the upcoming implementation of the Combined Tritium Facility (CTF) Safety Basis (SB). As part of this CTF, Kanne K-51…
Construction to re-lamp all T8 fluorescent light fixtures except those designated as emergency lights with new A and B UL LED T8 tubes.…
Replace Air Handling Unit at 701-2K.…
A new Nurse Station is to be installed and operated in Building 766-H, Rooms 1061 and 1066F for Savannah River Mission Completion employees.…
The EEC covers the renovations to the interior of building 717-10N.…
This activity includes sorption and desorption of solids and aqueous solutions to determine distribution coefficients for various elements.…
Office space improvements in 737-A.…
The adsorption of different gases (hydrogen, oxygen, neon, argon, krypton, xenon) on metal particles (silver, gold, copper, palladium, platinum) an…