Crystalline compounds of enriched uranium (U-235) will be fabricated via recrystallization of commercial compounds (uranyl nitrate and acetate) wit…
This EEC covers various general renovations for Building 723-A, such as flooring/cove base replacement, ceiling tile replacement, painting, and ele…
Install electrical power and sample tubing for SRNL Monitoring Trailer. The proposed location is north of 211-4H.…
Offsite Lease of Office Space for SRNS staff to support ongoing projects.…
Subcontractor will perform work to replace and repair the roof on Building 706-2F.…
This EEC addresses the MT to design and install an interim replacement for the obsolete Glovebox Oxygen Monitor's parts in the Tritium Extraction F…
Install mockup of the KIS Glovebox in Building 711-K. Proposed action will include modifications to existing Building 711-K that are necessary for …
Domestic Water Line Valve HQ-234000-DW-V-80.018 (provides make-up water for 218-2H Cooling Tower) will be corrected/replaced.…
Fabricate and replace the existing guardrails on the dock at 713-2N. Guardrails will be fabricated in the shop. The existing concrete will require …
Apply cool seal (Ames Maximum Stretch Coating) to trailer roofs and touch-up interior paint.…