General operation and maintenance of the Laser Flash Apparatus in the Hydrogen Technology Research Laboratory.…
This EEC covers various routine maintenance activities that occur in and around the buildings within the SRPPF Complex Area.…
Cut valve internals out and replace, welding and grinding is required.…
Airborne dust enters Building 218-1H through the five wall air intake louvers, which are not equipped with filters.…
Remove existing carpet tiles, floor tiles and mastic beneath carpet in room 216 and 36 in 234-H. Place new mastic and carpet in both rooms.…
Construction Craft to paint office areas in 248-H. Prior to painting, they will repair damaged wall surfaces by filling and sanding them smooth. Vi…
Assess and replace 234-H roof drain piping as applicable.…
Replace 233-H ELU-1 and ELU-5 lights with Light Emitting Diodes (LEDs) per E-DCF-H-09681…
Cranes are being excessed via established SRS protocol.…
This scope modifies 221-33F to reduce sound related hazards and to increase control of the discharge air from the relief valves.…