The EEC covers the renovations to the interior of building 717-3N.…
The EEC covers the renovations to the interior of building 711-1N.…
The Defense Waste Processing Facility Shielded Canister Transporter Uninterrupted Power Supply has been in service since 2017 and it is degrading a…
Paint 253-1H switchgear exterior. …
Construction will paint the top of the Naval Reactor Core Barrel.…
Replace a door at building 701-3G (Barnwell Barricade).…
This activity will investigate the dissolution rate kinetics of metal oxides, with a particular focus on lanthanide oxides, in an organic solutions…
Construction will Demolition and Disposition Uninterruptible Power Supply (UPS), conduit and wiring connected to the following panels: breaker pane…
Groundwater recovery well RWM 6, piped to the M-1 Air Stripper, has been underperforming. Savannah River National Laboratory (SRNL) has been retain…
Mold Coating testing is to determine which mold coating is the best and how much will need to be applied.…