Repaint/Restripe K-Area Main Parking Lot outside of the Limited Area entrance.…
FBI evidence examination and handling training using F-18 or La-140.…
Aqueous batch and/or column sorption experiments of constituents to solids with various modifications/functionalization. Sorption will be determine…
The Sellers Jet on the Nitric Acid Decontamination Feed Tank (NADFT) will be bypassed and replaced with a connection. The new connection will bring…
Replace High-Pressure Sodium Lights with Light-Emitting Diode Lights in Salt Solution Pump Room.…
Construction will utilize a JLG to access spalding concrete at 5/6 joint on west wall of 221-H to remove it.…
722-N Correct water intrusion.…
Create various blends of powder and aggregate materials for use in other projects to support K-Area and HB-Line.…
This EEC covers activities to repair cracked asphalt around a manhole in the Building 706-6F parking lot as well as activities necessary to extend …
Remove abandoned 115KV lines at SRS, including all wire, poles, hardware, and anchors.…