Currently there is a stainless-steel shielding rack located in cell 10. Lead shielding is encased in stainless steel.…
Carpet will be installed in room 149 at 731-N.…
SRNL has been tasked with examining how various forms of mercury can migrate through the solvent extraction system at Salt Waste Processing Facilit…
Perform semi-annual Tank 50 sample characterization to support operations of the Saltstone Facility at SRS.…
Install water sampling equipment at stream behind SRPPF administrative facility.…
The Proposed Activity (PA) is for Design Change Form (DCF) J-DCF-H-06285 to add details for an optional stand to be added to the frame holding the …
Revision 2: There are 12 total transformers, three on each of the 4 Precipitators. Through drone flights, we were able to verify the 12 transformer…
The Cell 9 Transfer Port Door must be removed in order to install a bagless transfer port to support the Mk-18 Program.…
The roof of Building 281-19F was damaged in the recent extreme weather event and must be repaired.…
Thermal Cycle Absorption Process (TCAP) Product Storage Bed C is to be replaced by new components in-kind and add TCAP Product Storage Bed C relief…