607-70G: Remove grout from boat clarifier inside oxidation ditch No. 1.…
Remove and replace electrical air compressor from building 717-1N…
Run copper cable from 719-5N to 704-199N.…
Weapon Production Technology (WPT) group is replacing the legacy inert gas purification system from Vacuum Atmospheres Company (VAC) in Lab C-061 p…
Various glass, ceramic and composite materials are routinely fabricated and characterized at the Aiken County Technical Laboratory (ACTL, Building …
This EEC will cover the laboratory preparation and analysis (within the analytical services shared lab) for environmental samples from multiple res…
The scope of work is to lay a 2" thick (min) layer of 9.5 mil asphalt mix with a non-woven geotextile underlayment applied over a tack coat over th…
The chemical control system at 780-2A will be replaced.…
Repair broken water line inside concrete wall and remodel 701-13G.…
Repair Leaks and Leak Damage for Construction Trailer 704-23K, and Local C-Train - Sealand (763-11K).…