The purpose of the CRC Project is to consolidate all monitoring and control functions from the F-Tank Farm control rooms to the 241-2H Control Room…
Upon demolition of control room panel as part of FCA, it was discovered that a section of the control panel was integrated into the main corridor h…
Replace Center Section Air Supply Fan 50 Pre-Heat steam coils (HCL 13 and 14) using specifications of existing coils, install drain from Supply Fan…
The EEC covers the renovations for the interior of building 713-1N.…
This EEC will serve to cover use of portable Reciprocating Internal Combustion Engines (RICE) powered equipment used to support Liquid Waste facili…
The Portable 221-S Mercury Cart Electrical Connection were found to be in a failed state and must be modified to be replaced.…
The project modifies Savannah River National Lab 773-A B
The purpose of this Temporary Modification is to install a temporary air supply via portable air compressors by way of a tie-in with the DWPF Plant…
The environmental drilling contractor will install 28 multi-screened nested monitoring wells at 10 boreholes to further define the volatile organic…
The scope of this activity is aimed at refurbishing Platinum Silicon Carbide (PtSiC) open cell foam through hydrogen reduction.…