This EEC supports activities post Cold and Dark status of Building 235-F. This revision includes the following proposed activities: deactivation of…
The EEC covers painting of the stairways and exterior doors to 713-1N.…
A hose-in-hose transfer line will be routed from an existing manifold in the Tank 10 Center Riser to Tank 11 Riser 2.…
The activity is to perform up to 6 Seismic Cone Penetrometer Testing (SCPT) and Cone Penetrometer Testing (CPT) for geotechnical evaluation (lithol…
Replacing existing centrifugal switches for the 238-H Exhaust Fan A (53.001-A) with a new speed switch.…
The Tritium Facility desires to execute a project to design and implement physical security upgrades for 234-7H and 246-2H Vault Type Rooms (VTRs) …
Subcontractor will perform repairs to the roof on Bldgs. 773-43A and Bldg. 779-A.…
This activity details the general operation of the FormLabs SLA resin 3D printers (Form2 and Form3 variations) along with the post-processing tasks…
This project is to synthesize nanoscale sodium titanates and then load them with gold ions for the University of Washington. Collaborators at the U…
This activity involves disassembly and removal of 12 Lektrievers and 66 Space Saver racks in 704-1N.…