The current battery bank substation in 251-H will be removed and replaced with new batteries of the same type.…
703-46A Install 1 UW Drop in Room 266.…
702-A Install Keri door on entry No. 4.…
The proposed activity will cover the connection, operation, and disconnection of air sampling systems in 773-A E-023 for effluent monitoring and ch…
Create Ingots containing uranium and/or thorium alloyed with stainless steel with small amounts of yttrium oxide created in D-0142 under the Enviro…
Remodel 713-N Room 7.…
Vendor will install bottle filling water stations near the kitchens on the second and third floors of 730-4B.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Rev. 0: Site construction will be replacing the bolts on catwalk/ladder and painting the M-1 Air Stripper and associated components as well as the …
T3 transformer in the L reactor area is being replaced. EP number is 105L-573.3. CLI number is L-105000-NEP-SWGR-T3-XFMR-3.…