The Cell 9 Transfer Port Door must be removed in order to install a bagless transfer port to support the Mk-18 Program.…
The roof of Building 281-19F was damaged in the recent extreme weather event and must be repaired.…
Thermal Cycle Absorption Process (TCAP) Product Storage Bed C is to be replaced by new components in-kind and add TCAP Product Storage Bed C relief…
NNSA grant for SCDHEC environmental monitoring - providing power for air monitors…
DOE has asked that 12 moderator drums in L-Area be sampled to see if a customer can use them. The customer has certain specifications.…
Setup and testing of sorbent material for incorporation into the offgas mitigation train of the Mobile Melter Consolidation (MMC) effort.…
Existing well CMP010A at the CMP Pits is in need of redevelopment. This well was installed in 2019 within the Gordon Aquifer. Issues with prior ins…
Remove abandoned bioassay equipment located in 735-A, C-Wing (WO
Replace light fixtures with LEDs at 711-N, 711-9N, 717-10N. Replace 1 electrical wall heater in 711-9N and 5 electrical wall heaters in 717-10N.…
Install new awning on trailer 704-24G.…