The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in B…
Re-develop 22 piezometers and 2 inclinometers in the vicinity of the Steel Creek Dam, and 48 piezometers in the vicinity of Par Pond Dam.…
The F/HAL Instrument Air Compressor (IAC) No. 3 heat exchanger failed during extreme cold in early January.…
730-B LED Light installation.…
Repairs/refurbishments shall be made to the basins to correct existing leaks, arrest existing corrosion, and minimize future corrosion of basin sur…
The current battery bank substation in 751-A will be removed and replaced with new batteries of the same type.…
On Thursday, March 16, Centerra will conduct a security exercise in B Area. During the exercise, Centerra Law Enforcement will establish roadblocks…
DCF and associated work order to repair the bottom of P68 manhole and raise it to grade for easier access in the future.…
Cleaning and surface modification procedures of wrought and additive manufactured stainless-steel components will be performed.…
This EEC covers the renovations to the west entrance airlock to 713-1N.…