The EEC covers the renovations to the interior of building 717-F.…
Renovations will be done in building 772-26B.…
The installation of IAEA surveillance systems and electrical power in the Criticality Control Overpacks (CCO) Pad Storage Facility, 163-70K, to all…
Remove wire and conduit between MCC 7 and Disconnect 7.06. Plug up holes left from the removed conduit.…
Electronic components in the HANM Unclassified Digital Control System (DCS) will be replaced with same fit form function components that are compat…
The US Army Corps of Engineers (USACE) will subcontract the final design and construction of Barricade 9 Entry Control Facility (ECF) replacement.…
A new container loading system (CLS) will be installed on TRU Pad 4.…
The Mobile Melt Consolidation (MMC) Project components will be installed at 645-N.…
The objective of this task is to measure the retention of mono-methylmercury (MM) in Saltstone cementitious grout under saturated leaching conditio…
This EEC covers various renovation activities for Building 703-41A.…