Isolation of Steam Facilities east of F-Canyon.…
The primary objectives of this activity are to verify the manufacturability of the TEP (tokamak exhaust processing) prototype, evaluate performance…
The purpose of this project is to return the emergency spillway at PAR Pond to as close to its original design configuration as feasible. The area …
Due to normal age and wear, five steam poles have been identified for replacement. Parts are direct replacements. Steam poles will be replaced util…
766-H Building renovations.…
Chilled Water Pump Replacement K-Area.…
Air gap 285-H steam turbine exhaust feed to 284-H.…
This EEC covers the trouble shooting and repair of Welding Exhaust Fan No. 2 at 717-3N.…
Install 2 CNC Machines for Advanced Engineering Group, Bldg 723-A, Room 161: (1) Install HAAS ST-20 CNC lathe and provide power and compressed air …
The Materials Compatibility and Welding Technology group presently houses three electrical resistance welding stations, two self-contained low powe…