Remodel/Repair Restrooms in 731-2N, 731-3N and 731-4N.…
Road B (9.7 miles) will be milled, paved, striped with thermoplastic, and edge dressed with topsoil and grassing.…
Centerra-SRS Training Department would like to develop an area in C-Area for training department use.…
Replace glovebox gaskets in GB OGE-GB-1593.…
This EEC covers the demolition of 54-39G wait station shed.…
Refurbish the old excess yard (763-52N).…
The 50-ohm resistance thermal device (RTD) for 6.2F will be replaced with a 100-ohm platinum (Pt) RTD. The associated recorder shall be reprogramme…
Removal of electrical to door 313 and 320 in 105-L and door 313 to be removed from building.…
A more suitable location to gauge field parameters at station L3R1-A was identified. The following activities will take place to establish the new …
Comprehensive Force-on-Force (CFoF) exercises that are conducted by Centerra-SRS are as realistic as possible and conducted in a safe manner.…