Replace Lift Station Pumps at 607-66G.…
Six single-wide trailers will be removed and replaced with three new double-wide trailers near gate 16.…
B-Area replacing trailer doors due to water damage.…
The dust collector (Z-205000-BMH-DCOL-0002) for Silo No. 4 is to be replaced.…
Characterization of per- and polyfluoroalkyl substances (PFAS) source area soil contamination, well installation, and volatile organic compound (VO…
Flow sensors are planned for installation at two locations in D Area. One will be installed in the discharge canal (DSWM-8B) and D006 outfall (DSWM…
The proposed work is to retrench and grade the existing dirt trench north of 794-A, cut and install a concrete swale from the 794-A trench across t…
This EEC covers the Renovation and adding wall for a breakroom in 717-10N.…
Removing/Adding Hardware on Disassembly Basin Doors…
Maintenance install 2 braces on the roof drainpipe in the 704-L Men's bathroom that Construction is currently working on.…