H canyon is sending Savannah River National Laboratory (SRNL) insoluble solids from an electrolytic dissolver. SRNL is to analyze these solids. Ana…
731-N Power wash and paint.…
Repair cracks, joints, and patchwork (spalling) on concrete intruder barrier at R-Area Seepage Basin.…
The US Army Corps of Engineers (USACE) will subcontract the final design and construction of Barricade 9 Entry Control Facility (ECF) replacement.…
This EEC will cover general renovation activities in 735-2A.…
Radiological Protection (RP) has identified a curb on second level where contamination is leaching out of the concrete creating an Airborne Radioac…
Revision 3: The tie in to the existing 3 in. potable water main has changed. The new tie in location will be near Bldg. 724-36E.…
Paint sealands behind 704-C.…
This change package is to extend Tank 32 purge fan stack to an elevation of 35 feet.…
706-N Freeze damage repair.…