C. E. Bourne Subcontractor will provide roof repairs at 701-2L. The Subcontractor will not disturb the existing roof while performing these repairs…
Corrosion testing per ASTM standards on stainless steels and corrosion-resistant alloys for intergranular corrosion susceptibility performed on met…
This EEC is for the placement of grout inside manhole P5 of the abandoned process sewer line north of 211-H.…
This activity will assess the use of specialized test kits for measurement of hexavalent chromium and to determine detection limits that can be ach…
The 786-5A Trailer is an older structure (Occupied) and needs all the windows repaired from water intrusion by leaking windows. Additional building…
Demolish and remove (D and R) 719-H South (front) and West (side) exterior double doors, frames (if needed), and lock assemblies.…
This project aims to design and construct a working water vapor detritiation unit for the passive for example, ambient condition) recovery of accum…
Disassemble, sort, and dispose of legacy RAD equipment located at the Salvage Yard.…
There is currently an installed Breathing Air (BA) header that feeds in portable BA through the hatch wall and ceilings to various locations in the…
Design, fabricate, and install one new Non-Nuclear Reconfiguration (NNR) Calorimeter to replace the NNR in 234-H. The NNR Calorimeter has been in s…