Fabricate and replace the existing guardrails on the dock at 713-2N.…
766-H Install PA speakers.…
Remove/Replace the 3 Magnetrol level switches at 285-H Basin.…
Remodel of the kitchen area of building 709-1 G.…
Add crush and run to construct an access road to Gate 34 to help facilitate access to emergency vehicles during emergency response or drills.…
Renovate 784-7A restroom.…
This scope covers remediation activities at the H06 outfall. Sampling from Radiological Protection revealed contamination in sediment in the mouth …
Replace the tile and carpet in the 105-K Central Control Room…
This EEC covers the implementation via P-DCP-H-18001 for the relocation of part of the 234-H Finishing Line process to 233-H.…
Remodel of the kitchen area at 709-7G.…