Installation of electric vehicle charging stations across SRS.…
This scope is to support the leak / low pH in the sewer drain lines leading to the H-12 Outfall. Water from standpipe will be pumped into P10B.…
E-DCP-H-18007 is for the replacement of Motor Control Center (MCC)-J.…
SREL intends to excess 29 handy houses of varying sizes to the SRSCRO.…
Construction is to patch holes in the flooring in fan motor compartment of AHU No. 1 and No. 2.…
The backflow preventer is located in the 285-4F courtyard. A replacement is available on site and will be utilized for the repair.…
The H-Canyon Central Exhaust Fan #3 breaker failed and damaged the entire cubicle (HS-254019-ELNH-MCC-C-EC-3A). This cubicle needs to be replaced.…
Power is to be relocated for the process water well at 905-20A to be fed from the A6 feeder.…
The goal of this work is to produce novel materials using the ball milling method of alloying under different gaseous atmospheres.…
The existing 12V Group 8D Interstate batteries (Part No. 8D-MHD) will be replaced with a 12V Trojan Battery Group 8D-AGM Dual Purpose (Part No. Mot…