Subcontractor will provide roof repairs to stop leaks at 735-4B.…
A research project focused on the effects of vegetation distribution on fire behavior and smoke plume development. In one 1-hectare plot, researche…
Subcontractor will perform a roof replacement on 192-2K. The Subcontractor will disturb the existing roof on 192-2K.…
Install plug in sewer manhole to isolate 284-H from the sanitary sewer system.…
Modification of Test Console Vent Piping in 221-33F.…
Rainwater has entered C-Area and collected in sump 216-C. Due to the nature of the former processes in C-Area the water is anticipated to be tritia…
Install UW drops for cubicle replacement in 703-43A.…
C. E. Bourne Subcontractor will provide roof repairs at 701-2L. The Subcontractor will not disturb the existing roof while performing these repairs…
Corrosion testing per ASTM standards on stainless steels and corrosion-resistant alloys for intergranular corrosion susceptibility performed on met…
This EEC is for the placement of grout inside manhole P5 of the abandoned process sewer line north of 211-H.…