The existing bubbless system to measure tank liquid levels are causing numerous unscheduled maintenance outages. The proposed solution is to replac…
Transport, Receipt, and Unloading of Samples from VC Summer. Rev. 2 Added returnig samples to glass vials, where the vials will be subsampled using…
Inert glovebox operations in 786-A to support R and D in which air sensitive material will be handled. This EEC captures only the operations around…
Propane supplied from the Flammable Gas Distribution System (FGDS) is no longer required throughout the facility and is only required for operation…
The existing gel cell batteries used for the Tritium Extraction Facility (TEF) diesel generator are no longer available from the supplier. The curr…
The activity is to replace the 151-1K DC breaker panel due to age and normal wear over time.…
Install flow meter, solar panel, sampler, and sensor in culvert after the E-3 basin. Equipment will help measure water discharged from E-3 basin an…
Several wall panels (interior and exterior) on the D-wing of building 773-A have deteriorated and cracked due to age and normal wear and tear. Asbe…
This EEC covers various general renovations for Building 773-A A-wing in non-radiological areas. Scope includes D and R such as replacing refrigera…
This EEC supports activities post Cold and Dark status of Building 235-F.…