Offsite Lease of Office Space for SRNS staff to support ongoing projects.…
Subcontractor will perform work to replace and repair the roof on Building 706-2F.…
This EEC addresses the MT to design and install an interim replacement for the obsolete Glovebox Oxygen Monitor's parts in the Tritium Extraction F…
Install mockup of the KIS Glovebox in Building 711-K. Proposed action will include modifications to existing Building 711-K that are necessary for …
Domestic Water Line Valve HQ-234000-DW-V-80.018 (provides make-up water for 218-2H Cooling Tower) will be corrected/replaced.…
Fabricate and replace the existing guardrails on the dock at 713-2N. Guardrails will be fabricated in the shop. The existing concrete will require …
Apply cool seal (Ames Maximum Stretch Coating) to trailer roofs and touch-up interior paint.…
This EEC supports activities post Cold and Dark status of Building 235-F. This revision includes the following proposed activities: deactivation of…
The EEC covers painting of the stairways and exterior doors to 713-1N.…
A hose-in-hose transfer line will be routed from an existing manifold in the Tank 10 Center Riser to Tank 11 Riser 2.…