Remote interlock is to be added to the Salt Solution Receipt Tank Process Vessel Vent Heater Controller.…
Installation of a double-wide trailer in E-Area. This revision includes the installation of a sidewalk along building 704-75E.…
This modification will replace E3S in K-Area with the Lawrence-Livermore National Laboratory (LLNL) Argus Security System.…
Testing of a 3D printed coalescer designed to aid in the separation of elemental mercury from the offgas/condensate stream of a chemical processing…
Additional K-Area Storage Building Beautification and Enhancements, Rooms 1029 and 1003.…
This EEC covers various general renovations for Building 773-A D-wing. Scope includes D
Remove weeds via pulling, cutting, clipping in the K-Area Sand Filter and Settler Tank Area. This is currently an inactive contamination area (CA).…
Repaint/Restripe K-Area Main Parking Lot outside of the Limited Area entrance.…
FBI evidence examination and handling training using F-18 or La-140.…
Aqueous batch and/or column sorption experiments of constituents to solids with various modifications/functionalization. Sorption will be determine…